Installation instructions to rotary double-ported charge valve: Welcome to select the patented products of our company. In order to prolong service life and improve operating efficiency, this valve should be installed as vertical as possible, and if the conditions do not allow the installation should be carried out in 45°. For upside-down or horizontal installation, the idle conveying time must be extended so as to avoid ash accumulation in valve. In this valve the return signal adopts imported inductive magnetic switch two-wire system, and the signal line can adapt to both DC and AC via load. “Refer to the figure for installation of signal line”
Operating instructions 1、Before installation this instruction should be carefully read, and type, full bore and technical parameters of the valve be checked.
2、 After installation of valve welding flange is forbidden to prevent from damaging the seal ring of valve. The installation distance for valve reserved in pipelines shall be appropriate, and gaskets shall be added on both sides of flange.
3、The centers of two pipelines shall be remained coaxial with the center of valve full bore, and two sides of flange shall be smooth so as to guarantee clamping and normal operation of valve.